Annually determined NTC value
The annual determination of the NTC (Net Transfer Capacity) values is based on the following assumptions:
- All grid elements are in operation
- The load flow is evenly spread over the operating resources
The annual NTC values are indicative only and may deviate from the corresponding D-2 NTC values.
NTC 2010 Import and Export (PDF / 65kB)
From Switzerland
| to | Winter | Summer | |||
|---|---|---|---|---|---|
| Day | Border | Period 1 7h - 23h |
Period 2 23h - 7h |
Period 1 7h - 23h |
Period 2 23h - 7h |
| Monday to Saturday | France |
2300 |
2300 |
1400 |
3200 |
| Germany | 3200 |
3200 |
4400 |
4400 |
|
| Austria | 1200 |
1200 |
1000 |
1200 |
|
| Italy (*) | 4240 |
3750 |
3460 |
3140 |
|
| Sunday and public holidays | France | 2300 |
2300 |
3200 |
3200 |
| Germany | 3200 |
3200 |
4400 |
4400 |
|
| Austria | 1200 |
1200 |
1200 |
1200 |
|
| Italy (*) | 3750 |
3750 |
3226 |
3140 |
|
To Switzerland
| from | Winter | Summer | |||
|---|---|---|---|---|---|
| Day | Border | Period 1 7h - 23h |
Period 2 23h - 7h |
Period 1 7h - 23h |
Period 2 23h - 7h |
| Monday to Saturday | France |
3200 |
3200 |
3000 |
3000 |
| Germany | 1500 |
1500 |
2060 |
1790 |
|
| Austria | 470 |
470 |
540 |
540 |
|
| Italy (*) | 1810 |
1910 |
1440 |
1660 |
|
| Sunday and public holidays | France | 3200 |
3200 |
3000 |
3000 |
| Germany | 1500 |
1500 |
1860 |
1790 |
|
| Austria | 470 |
470 |
490 |
460 |
|
| Italy (*) | 1910 |
1910 |
1660 |
1660 |
|
No single Transmission System Operator can be held liable if the maximum values listed in the table cannot be provided in the auctions. Whereby
- All values are indicated in MW.
- Winter includes the following months: January, February, March, April, October, November and December. Possible exceptions are defined in the various «Auction Specifications».
- Summer includes the following months: May, June, July, August
and September. Possible exceptions are defined in the various
«Auction Specifications».
Comments
(*) Swiss-Italian border (in both directions)
- Transmission system operators APG, ELES, HTSO, RTE, swissgrid
and Terna have defined the indicative and non-binding NTC values
(in MW) for the French-Italian border, Swiss-Italian border,
Austrian-Italian border, Slovenian-Italian border and
Greek-Italian border. This was done as part of the activities of
the «Implementation Group» of ERGEG (European Regulators' Group
for Electricity and Gas)«Region Central South».
- The NTC values contain the NTC values for the «Merchant Lines»
- Cagno-Mendrisio (380 kV)
- Tirano-Campocologno (150 kV)
- For which the following values were determined
- Winter Peak 350 MW
- Winter Off-Peak 350 MW
- Summer Peak 300 MW
- Summer Off-Peak 350 MW
- Please note that the public holidays are public holidays in Italy
- The values in the table above show maximum values which were agreed by the transmission system operators. These values must be regarded as indicative and non-binding.