Annually determined NTC value

The annual determination of the NTC (Net Transfer Capacity) values is based on the following assumptions:

  • All grid elements are in operation
  • The load flow is evenly spread over the operating resources

The annual NTC values are indicative only and may deviate from the corresponding D-2 NTC values.

NTC 2010 Import and Export (PDF / 65kB)


From Switzerland

  to Winter Summer
Day Border Period 1
7h - 23h
Period 2
23h - 7h
Period 1
7h - 23h
Period 2
23h - 7h
Monday to Saturday France
2300
2300
1400
3200
Germany 3200
3200
4400
4400
Austria 1200
1200
1000
1200
Italy (*) 4240
3750
3460
3140
Sunday and public holidays France 2300
2300
3200
3200
Germany 3200
3200
4400
4400
Austria 1200
1200
1200
1200
Italy (*) 3750
3750
3226
3140


To Switzerland

  from Winter Summer
Day Border Period 1
7h - 23h
Period 2
23h - 7h
Period 1
7h - 23h
Period 2
23h - 7h
Monday to Saturday France
3200
3200
3000
3000
Germany 1500
1500
2060
1790
Austria 470
470
540
540
Italy (*) 1810
1910
1440
1660
Sunday and public holidays France 3200
3200
3000
3000
Germany 1500
1500
1860
1790
Austria 470
470
490
460
Italy (*) 1910
1910
1660
1660


No single Transmission System Operator can be held liable if the maximum values listed in the table cannot be provided in the auctions. Whereby

  • All values are indicated in MW.
  • Winter includes the following months: January, February, March, April, October, November and December. Possible exceptions are defined in the various «Auction Specifications». 
  • Summer includes the following months: May, June, July, August and September. Possible exceptions are defined in the various «Auction Specifications».


Comments

(*) Swiss-Italian border (in both directions)

  • Transmission system operators APG, ELES, HTSO, RTE, swissgrid and Terna have defined the indicative and non-binding NTC values (in MW) for the French-Italian border, Swiss-Italian border, Austrian-Italian border, Slovenian-Italian border and Greek-Italian border. This was done as part of the activities of the «Implementation Group» of ERGEG (European Regulators' Group for Electricity and Gas)«Region Central South».
  • The NTC values contain the NTC values for the «Merchant Lines»
  • Cagno-Mendrisio (380 kV)
  • Tirano-Campocologno (150 kV)
  • For which the following values were determined
  • Winter Peak 350 MW
  • Winter Off-Peak 350 MW
  • Summer Peak 300 MW
  • Summer Off-Peak 350 MW
  • Please note that the public holidays are public holidays in Italy