Ancillary services

The terms and conditions for delivery of ancillary services are set out in ancillary service contracts. Following examination of the technical and operational requirements of a supplier (Prequalification), contracts can be concluded for the respective product (Ancillary services). This then allows quotations to be submitted for invitations to tender.

 

1. Primary control Switzerland - Austria - Germany - Netherlands

Date Description Format
08.11.2016 Technical regulations and procedural rules governing the prequalification of ASP for the supply of primary control power PDF
24.10.2016 Framework agreement for the supply of primary control power PDF
24.10.2016 Conditions of tender – primary control power
(valid from 01.02.2017)
PDF

2. Secondary control

Date Description Format
24.10.2016 Conditions of tender – Secondary Control Power
(valid from 01.02.2017)
PDF
24.10.2016 Technical regulations and procedural rules for prequalification of an ASP for the supply of secondary control power PDF
24.10.2016 Framework Agreement for the Supply of Secondary Control Power PDF

3. Tertiary control

Date Description Format
25.01.2017 Conditions of tender – Tertiary Control Power
(valid from 01.02.2017)
PDF
24.10.2016 Technical regulations and procedural rules for prequalification of an ASP for the supply of tertiary control power PDF
24.10.2016 Framework agreement for the delivery of tertiary control power PDF

4. Active power losses

Date Description Format
08.11.2016 Framework Agreement governing the supply and purchase of energy for the compensation of active power losses PDF
13.11.2008 Tendering conditions – active power losses (German) PDF

5. Black start and island operation capability (German)

Date Description Format
30.06.2016 Formular: Angebot - Schwarzstart und Inselbetriebsfähigkeit XLSX
30.06.2016 Ausschreibungsbedingungen und Entschädigungsmodell PDF

6. Form for a partner plant participation

Date Description Format
24.10.2016 Guaranteeing operational management PDF

7. AS Allocation procedure

Date Description Format
24.10.2016 AS Allocation procedure PDF
24.10.2016 Vorlage Kraftwerksleistung (German) XLSX
Share
Facebook
Twitter